BioWatt retained to advise large German Energy Company on UK anaerobic digestion investment
Plant Acquisition – Technical Advice

BioWatt retained to advise large German Energy Company on UK anaerobic digestion investment
Local Authority appoints BioWatt to assess feasibility of building their own AD facility.
BioWatt has been advising a large investment group on the acquisition of existing AD assets in the UK
Biomethane to Grid (900m3/hr) Biogas Project (75,000 tpa) [ezcol_1third]BioWatt developed, secured funding for, managed the construction of and is now operating and managing this 75,000 TPA pre-consumer food waste biomethane to grid project. Construction of the plant began in 2016
BioWatt increases its operations in the UK with the takeover of Station Works
1MW CHP Farm-Biogas Project (20,000 tpa) Station Works anaerobic digestion facility is a 1MW CHP crop and farm residue fed facility near Stanstead Airport. Owned by Katharos Organic Ltd, it was originally developed by Hallwick Energy and Triple Point. The
500KW CHP Farm-Biogas Project (10,000 tpa) Marsh Farm Biogas is a livestock farm near Basildon supplying animal manures, crops and residues to the 499KW anaerobic digestion and drying plant. Construction commenced: June 2016 G59 approval: September 2016 RHI commissioning: March 2017
PROJECT NAME: BIOGAS STRATEGY CLIENT: ANGLIAN WATER BioWatt has been asked by Anglian Water to assist and advise on how they can grow the amount of Biogas they produce through AD. Anglian Water have made great strides, investing £230m over the last 10 years, and
PROJECT NAME: BIOGAS FEASIBILITY STUDY CLIENT: LONDON BOROUGH OF HOUNSLOW The London Borough of Hounslow approached BioWatt Developments to assist them with their thinking concerning a piece of land which they owned inside the Borough. The large area was brownfield