    Plant Acquisition – Technical Advice

    Plant Acquisition – Technical Advice

    BioWatt retained to advise large German Energy Company on UK anaerobic digestion investment

    biowatt April 16, 2020November 13, 2023 Case Study, News Read more

    BioWatt Appointed to Undertake Feasibility Study

    BioWatt Appointed to Undertake Feasibility Study

    Local Authority appoints BioWatt to assess feasibility of building their own AD facility.

    biowatt December 4, 2019November 13, 2023 Case Study, News Read more

    CASE STUDY – technical/ commercial advice

    CASE STUDY – technical/ commercial advice

    BioWatt has been advising a large investment group on the acquisition of existing AD assets in the UK

    biowatt June 28, 2019November 13, 2023 Case Study, News Read more

    Biogas Case Study: Bonby Biogas

    Biogas Case Study: Bonby Biogas

    Biomethane to Grid (900m3/hr) Biogas Project (75,000 tpa) [ezcol_1third]BioWatt developed, secured funding for, managed the construction of and is now operating and managing this 75,000 TPA pre-consumer food waste biomethane to grid project.  Construction of the plant began in 2016

    biowatt December 1, 2018November 13, 2023 Case Study, News Read more

    BioWatt in the Press

    BioWatt in the Press

    BioWatt increases its operations in the UK with the takeover of Station Works

    biowatt December 15, 2017February 17, 2021 Case Study, News Read more

    Biogas Case Study: Station Works

    Biogas Case Study: Station Works

    1MW CHP Farm-Biogas Project (20,000 tpa) Station Works anaerobic digestion facility is a 1MW CHP crop and farm residue fed facility near Stanstead Airport.  Owned by Katharos Organic Ltd, it was originally developed by Hallwick Energy and Triple Point. The

    biowatt December 6, 2017November 13, 2023 Case Study, News Read more

    Biogas Case Study: Marsh Farm

    Biogas Case Study: Marsh Farm

    500KW CHP Farm-Biogas Project (10,000 tpa) Marsh Farm Biogas is a livestock farm near Basildon supplying animal manures, crops and residues to the 499KW anaerobic digestion and drying plant. Construction commenced: June 2016 G59 approval: September 2016 RHI commissioning: March 2017

    biowatt July 20, 2017November 13, 2023 Case Study Read more

    CASE STUDY: Biogas/ AD Strategy

    CASE STUDY: Biogas/ AD Strategy

    PROJECT NAME: BIOGAS STRATEGY CLIENT: ANGLIAN WATER BioWatt has been asked by Anglian Water to assist and advise on how they can grow the amount of Biogas they produce through AD. Anglian Water have made great strides, investing £230m over the last 10 years, and

    biowatt September 16, 2015November 13, 2023 Case Study Read more

    CASE STUDY: Biogas Feasibility Study

    CASE STUDY: Biogas Feasibility Study

     PROJECT NAME: BIOGAS FEASIBILITY STUDY CLIENT: LONDON BOROUGH OF HOUNSLOW The London Borough of Hounslow approached BioWatt Developments to assist them with their thinking concerning a piece of land which they owned inside the Borough.  The large area was brownfield

    biowatt December 28, 2014November 13, 2023 Case Study Read more

    Contact Us

    The best way to contact us is by email at…

    solutions@biowatt.uk.com

    Recent Posts

    • JOB OPPORTUNITY – Operations Manager (WINCANTON)
    • BioWatt Appointed to Support RNG to Grid Construction Project
    • Successful Financing for a New RNG Facility
    • More Construction Progress
    • NFU Open Day 2024
    • Home
    • Cookies
    • Privacy
    • Contact
    Copyright © 2025 BioWatt. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.
    • Home
    • Cookies
    • Privacy
    • Contact