Biomethane to Grid (900m3/hr) Biogas Project (75,000 tpa) [ezcol_1third]BioWatt developed, secured funding for, managed the construction of and is now operating and managing this 75,000 TPA pre-consumer food waste biomethane to grid project. Construction of the plant began in 2016
Biogas Case Study: Bonby Biogas






